By following a detailed, phase-by-phase installation plan, organisations
can ensure that Architectural Glass and Rooflight systems
are installed to the highest standards of quality, safety, and performance.
Each stage — from the meticulous pre-installation assessments and planning to
careful, precision-driven installation and robust post-installation quality
checks — plays a pivotal role in delivering a final product that meets both
industry standards and client expectations.
We cover the following related services:
Pre-Installation
Phase
- Project
Assessment and Site Survey
- Design
assessment
- Create
and review the Safe Systems of Works
- Delivery
Schedule Coordination
Installation
Phase
- Site
Preparation
- Layout
and Marking
- Installation
of Glass Panels and Rooflight Systems
- Alignment,
Adjustments and Testing
Post-Installation
Phase
- Sealing,
Waterproofing and Insulation
- Cleaning,
Detailing and Protection
- Quality
Assurance, Documentation and Handover
- Client
Training and Aftercare Support
Project
Management and Documentation
Throughout the installation process, our site teams maintain
detailed documentation of all activities, including daily logs, inspection
reports, and communication records. Our Site Managers will use adequate project
management forms to track progress, and manage resources, to ensure timely
completion of the project.
Our commitment
By following a
comprehensive installation service plan, our organisation can ensure a high-quality,
efficient, and safe installation of Architectural Glass and Rooflight systems
that not only facilitates the efficient deployment of these advanced glazing
systems but also ensures long-term durability and optimal performance in the
built environment.
By following a detailed,
phase-by-phase installation plan, organisations can ensure that Architectural
Glass and Rooflight systems
are
installed to the highest standards of quality, safety, and performance. Each
stage — from the meticulous pre-installation assessments and planning to
careful, precision-driven installation and robust post-installation quality
checks — plays a pivotal role in delivering a final product that meets both
industry standards and client expectations.
We cover the following related services:
Pre-Installation
Phase
- Project
Assessment and Site Survey
- Conduct
a comprehensive assessment of the project requirements, including
architectural, installation and detail drawings, specifications, and performance
requirements for glass panels and rooflights.
- Perform
a site visit to review accessibility to workfaces and logistic
requirements for the unloading, decanting and distribution of materials.
- Identify
any potential obstructions, access issues, or environmental factors
(e.g., roof slope, wind exposure) that could affect delivery or
installation.
- Conduct
a detailed on-site survey to verify SO dimensions and review of the installation
surfaces, ensuring support structures and anchorage points are suitable
for glass and rooflight installations.
- Design
Assessment
- Review
the installation drawings and collaborate with designers and engineers to
validate the proposed design, ensuring the hidden or impossible fixings
are eliminated and establishing the most efficient installation sequence.
- Ensure
that the support frames, fixings, ancillary cladding elements and any substructure
elements are designed to accommodate harmoniously the interface with the
structural supports and other planned or existing adjacent cladding or
roof waterproofing systems.
- Create
and review the Safe Systems of Works
- Prepare
comprehensive risk assessments (RAMS) covering glass handling, lifting
operations, and work on roofs or elevated platforms.
- Define
emergency protocols and ensure all personnel are appropriately briefed
and trained in working with fragile materials.
- Develop
specialized lifting plans, considering the weight and fragility of glass
panels and rooflight units, as well as specific machinery and accessories
(e.g., suction lifters, vacuum technology).
- Delivery
Schedule Coordination
- Synchronize
the delivery of architectural glass and rooflight components with
installation timelines, factoring in the site storage constraints,
weather conditions, and handling requirements.
- Inspect
all received materials for defects or damage before moving them to the
installation area.
Installation
Phase
- Site
Preparation
- Resource
the storage needs for tools and sensible materials, lifting equipment and
accessories, access requirements, PPE, consumables, safety barriers and
man-safe systems, and any other necessary equipment.
- Set
up secure, weather-protected storage close to the installation site to
minimize handling and exposure.
- Ensure
all safety protocols are in place, including temporary barriers, safety
nets, and guardrails around roof work zones.
- Ensure
all installation personnel are equipped with the required personal
protective equipment (PPE), have the appropriate training and have been
briefed on all required emergency and rescue procedures.
- Layout
and Marking
- Using
laser levels and other precision tools, accurately mark the positions of
the glass or rooflight anchor points on the support structure.
- Confirm
that the layout aligns with the approved design drawings, accounting for
expansion gaps and aesthetic considerations.
- Where
necessary, pre-install sub-structure elements (e.g., brackets, anchors,
posts or support frames) to ensure secure fixation of the glass and
rooflight systems.
- Installation
of Glass Panels and Rooflight Systems
·
Glass Panel
Installation:
- Position
and secure the glass panels onto the prepared support system.
- Use
specialised glazing techniques (either dry- or wet-glazing) appropriate
to the glass type, applying pressure ring nuts, gaskets, or setting
blocks to ensure even load distribution.
- Check
for correct alignment and make any necessary adjustments.
· Rooflight Installation:
- Install
the rooflight units with care to maintain the integrity of the
waterproofing system.
- Ensure
that flashing and sealing details are correctly incorporated to prevent
water ingress.
- For
operable rooflights, verify that the mechanism (manual or powered) is
aligned and functions smoothly.
- Alignment,
Adjustments and Testing
- Carefully
check that all panels and rooflights are plumb, level, correctly spaced
and properly seated.
- Make
minor adjustments to accommodate any misalignments or variations in
fabrication tolerances.
- Conduct
initial functionality tests on operable rooflights (if applicable) to
ensure smooth opening, closing, and safety lock operations.
Post-Installation
Phase
- Sealing,
Waterproofing, and Insulation
- Apply
appropriate sealants and glazing tapes at all joints to achieve
weatherproofing, air-tightness, and thermal performance.
- Perform
water and wind tests on rooflight installations and perimeter seals to
ensure complete waterproofing and to validate the resilience of the
system under simulated weather conditions.
- Cleaning, Detailing and
Protection
- Remove
all installation debris, fingerprints, vacuum suction pad marks and
smudges from glass surfaces using non-abrasive cleaning agents designed
for architectural glass.
- Inspect
the edge details, joints, and trim elements to ensure a consistent,
high-quality finish across the installed systems.
- Apply
any necessary finishes or protective coatings.
- Quality
Assurance, Documentation and Handover
- Conduct
a thorough final inspection comparing the installation against design and
performance specifications, addressing any inconsistencies before project
handover.
- Prepare
comprehensive documentation, including as-built drawings, quality test
reports, maintenance guidelines, and warranty information for both the
glass and rooflight systems.
- Client Training and
Aftercare Support
- Provide
training sessions for the client’s maintenance team on safe cleaning
practices, inspection routines, and troubleshooting for operable systems.
- Establish
clear channels for aftercare support, including scheduled maintenance
visits and prompt response plans for any issues related to the installed
systems.
Project
Management and Documentation
Throughout the installation process, our site teams maintain
detailed documentation of all activities, including daily logs, inspection
reports, and communication records. Our Site Managers will use adequate project
management forms to track progress, and manage resources, to ensure timely
completion of the project.
Our commitment
By following a comprehensive installation service plan, our organisation
can ensure a high-quality, efficient, and safe installation of Architectural
Glass and Rooflight systems that not only facilitates the efficient deployment
of these advanced glazing systems but also ensures long-term durability and
optimal performance in the built environment.