By following a detailed, phase-by-phase installation plan, organisations
can ensure that Architectural Glass and Rooflight systems
are installed to the highest standards of quality, safety, and performance.
Each stage from the meticulous pre-installation assessments and planning to
careful, precision-driven installation and robust post-installation quality
checks plays a pivotal role in delivering a final product that meets both
industry standards and client expectations.
We cover the following related services:
Pre-Installation
Phase
 - Project
     Assessment and Site Survey
 
 - Design
     assessment
 
 - Create
     and review the Safe Systems of Works
 
 - Delivery
     Schedule Coordination
 
Installation
Phase
 - Site
     Preparation
 
 - Layout
     and Marking
 
 - Installation
     of Glass Panels and Rooflight Systems
 
 - Alignment,
     Adjustments and Testing
 
Post-Installation
Phase
 - Sealing,
     Waterproofing and Insulation
 
 - Cleaning,
     Detailing and Protection
 
 - Quality
     Assurance, Documentation and Handover
 
 - Client
     Training and Aftercare Support
 
Project
Management and Documentation
Throughout the installation process, our?site teams maintain
detailed documentation of all activities, including daily logs, inspection
reports, and communication records. Our Site Managers will use adequate project
management forms to track progress, and manage resources, to ensure timely
completion of the project.
Our commitment
By following a
comprehensive installation service plan, our organisation can ensure a high-quality,
efficient, and safe installation of Architectural Glass and Rooflight systems
that not only facilitates the efficient deployment of these advanced glazing
systems but also ensures long-term durability and optimal performance in the
built environment.
 
                      By following a detailed,
phase-by-phase installation plan, organisations can ensure that Architectural
Glass and Rooflight systems
are
installed to the highest standards of quality, safety, and performance. Each
stage from the meticulous pre-installation assessments and planning to
careful, precision-driven installation and robust post-installation quality
checks plays a pivotal role in delivering a final product that meets both
industry standards and client expectations.
We cover the following related services:
Pre-Installation
Phase
 - Project
     Assessment and Site Survey
 
 
  - Conduct
      a comprehensive assessment of the project requirements, including
      architectural, installation and detail drawings, specifications, and performance
      requirements for glass panels and rooflights.
 
  - Perform
      a site visit to review accessibility to workfaces and logistic
      requirements for the unloading, decanting and distribution of materials.
 
  - Identify
      any potential obstructions, access issues, or environmental factors
      (e.g., roof slope, wind exposure) that could affect delivery or
      installation.
 
  - Conduct
      a detailed on-site survey to verify SO dimensions and review of the installation
      surfaces, ensuring support structures and anchorage points are suitable
      for glass and rooflight installations.
 
 
 - Design
     Assessment
 
 
  - Review
      the installation drawings and collaborate with designers and engineers to
      validate the proposed design, ensuring the hidden or impossible fixings
      are eliminated and establishing the most efficient installation sequence.
 
  - Ensure
      that the support frames, fixings, ancillary cladding elements and any substructure
      elements are designed to accommodate harmoniously the interface with the
      structural supports and other planned or existing adjacent cladding or
      roof waterproofing systems.
 
 
 - Create
     and review the Safe Systems of Works
 
 
  - Prepare
      comprehensive risk assessments (RAMS) covering glass handling, lifting
      operations, and work on roofs or elevated platforms.
 
  - Define
      emergency protocols and ensure all personnel are appropriately briefed
      and trained in working with fragile materials.
 
  - Develop
      specialized lifting plans, considering the weight and fragility of glass
      panels and rooflight units, as well as specific machinery and accessories
      (e.g., suction lifters, vacuum technology).
 
 
 - Delivery
     Schedule Coordination
 
 
  - Synchronize
      the delivery of architectural glass and rooflight components with
      installation timelines, factoring in the site storage constraints,
      weather conditions, and handling requirements.
 
  - Inspect
      all received materials for defects or damage before moving them to the
      installation area.
 
 
Installation
Phase
 - Site
     Preparation
 
 
  - Resource
      the storage needs for tools and sensible materials, lifting equipment and
      accessories, access requirements, PPE, consumables, safety barriers and
      man-safe systems, and any other necessary equipment.
 
  - Set
      up secure, weather-protected storage close to the installation site to
      minimize handling and exposure.
 
  - Ensure
      all safety protocols are in place, including temporary barriers, safety
      nets, and guardrails around roof work zones.
 
  - Ensure
      all installation personnel are equipped with the required personal
      protective equipment (PPE), have the appropriate training and have been
      briefed on all required emergency and rescue procedures.
 
 
 - Layout
     and Marking
 
 
  - Using
      laser levels and other precision tools, accurately mark the positions of
      the glass or rooflight anchor points on the support structure.
 
  - Confirm
      that the layout aligns with the approved design drawings, accounting for
      expansion gaps and aesthetic considerations.
 
  - Where
      necessary, pre-install sub-structure elements (e.g., brackets, anchors,
      posts or support frames) to ensure secure fixation of the glass and
      rooflight systems.
 
 
 - Installation
     of Glass Panels and Rooflight Systems
 
 Glass Panel
Installation:
 
  - Position
      and secure the glass panels onto the prepared support system.
 
  - Use
      specialised glazing techniques (either dry- or wet-glazing) appropriate
      to the glass type, applying pressure ring nuts, gaskets, or setting
      blocks to ensure even load distribution.
 
  - Check
      for correct alignment and make any necessary adjustments.
 
 
 Rooflight Installation:
 
  - Install
      the rooflight units with care to maintain the integrity of the
      waterproofing system.
 
  - Ensure
      that flashing and sealing details are correctly incorporated to prevent
      water ingress.
 
  - For
      operable rooflights, verify that the mechanism (manual or powered) is
      aligned and functions smoothly.
 
 
 - Alignment,
     Adjustments and Testing
 
 
  - Carefully
      check that all panels and rooflights are plumb, level, correctly spaced
      and properly seated.
 
  - Make
      minor adjustments to accommodate any misalignments or variations in
      fabrication tolerances.
 
  - Conduct
      initial functionality tests on operable rooflights (if applicable) to
      ensure smooth opening, closing, and safety lock operations.
 
 
Post-Installation
Phase
 - Sealing,
     Waterproofing, and Insulation
 
 
  - Apply
      appropriate sealants and glazing tapes at all joints to achieve
      weatherproofing, air-tightness, and thermal performance.
 
  - Perform
      water and wind tests on rooflight installations and perimeter seals to
      ensure complete waterproofing and to validate the resilience of the
      system under simulated weather conditions.
 
 
 - Cleaning, Detailing and
     Protection
 
 
 
  - Remove
      all installation debris, fingerprints, vacuum suction pad marks and
      smudges from glass surfaces using non-abrasive cleaning agents designed
      for architectural glass.
 
  - Inspect
      the edge details, joints, and trim elements to ensure a consistent,
      high-quality finish across the installed systems.
 
  - Apply
      any necessary finishes or protective coatings.
 
 
 - Quality
     Assurance, Documentation and Handover
 
 
  - Conduct
      a thorough final inspection comparing the installation against design and
      performance specifications, addressing any inconsistencies before project
      handover.
 
  - Prepare
      comprehensive documentation, including as-built drawings, quality test
      reports, maintenance guidelines, and warranty information for both the
      glass and rooflight systems.
 
 
 - Client Training and
     Aftercare Support
 
 
  - Provide
      training sessions for the client's maintenance team on safe cleaning
      practices, inspection routines, and troubleshooting for operable systems.
 
  - Establish
      clear channels for aftercare support, including scheduled maintenance
      visits and prompt response plans for any issues related to the installed
      systems.
 
 
Project
Management and Documentation
Throughout the installation process, our site teams maintain
detailed documentation of all activities, including daily logs, inspection
reports, and communication records. Our Site Managers will use adequate project
management forms to track progress, and manage resources, to ensure timely
completion of the project.
Our commitment
By following a comprehensive installation service plan, our organisation
can ensure a high-quality, efficient, and safe installation of Architectural
Glass and Rooflight systems that not only facilitates the efficient deployment
of these advanced glazing systems but also ensures long-term durability and
optimal performance in the built environment.