Client: Lakesmere
Project Name: Redevelopment of the London Bridge Station
End Client: Network Rail
Main Contractor: Costain
Our scope of work:
Built in the 1830s, London Bridge is the
oldest train station in London and one of the oldest in the world.
A major component of the 7bn Thameslink
Programme involved the redevelopment and reconfiguration of London Bridge Station.
It was one of the most complex and ambitious rail station redevelopments in the
UK, including complex multi-staged infrastructure realignment and the complete
rebuild of London Bridge station while maintaining operations.
The aim of the 1bn station design and construction project has
been to fully remodel the station, add new platforms and a vast new concourse,
designed to provide a significant improvement to the passenger experience. It
was expected to increase the number of passengers from 42 million to between 50
and 75 million people a year.